Confirm Korczowa border slot
ETA risk moved to medium after telemetry and border queue signal.
BFG Control command center
Operations task control
A live workbench for seeded tasks, scenario follow-ups, owners and DB/auth-ready task status transitions.
Open tasks
19
Active work still before completion.
Critical
11
Highest priority tasks still open.
Due today
12
Open items inside today's operating window.
Completed
0
Tasks already closed in this session.
Ranks 19 open tasks, 3 active owners and 11 scenario follow-ups into one owner-safe work plan.
Recommended action
Clear critical owner blockers first
11 critical tasks remain inside 19 open items; rebalance dispatch and SLA work before routine close-out.
Owner load
Marek Zielinski currently carries 11 open tasks.
SLA blockers
39 SLA exceptions and 10 blocked tasks need owner review.
Team split
Dispatch 8, Compliance 6 and Finance 2 tasks remain open.
Scenario evidence
11 scenario follow-ups are attached to this Kanban board.
Cutover tasks
Release 3/5 and rollback 0/4 gates are reflected in owner work.
Follow-up checklist
Team filter
Task board
Seed tasks and scenario follow-ups share the same status lanes and owner model.
To do
Confirm Korczowa border slot
ETA risk moved to medium after telemetry and border queue signal.
BFG-338 mobile repair dispatch
Repair required on active western Ukraine route.
BFG-914 mobile repair dispatch
Engine emission fault, repair required before Alpine crossing.
BFG-706 mobile repair dispatch
Turbo pressure fault; truck stopped near Izmail road.
Send mock KSeF package
Sales invoice is generated and ready for publication in the Client Portal.
In progress
BFG-512 wrong-way route recovery
Wrong corridor: vehicle left the Kyiv-Korczowa lane and is moving north.
BFG-777 wrong-way route recovery
Wrong corridor: vehicle moved south instead of the Berlin lane.
Review Vistula insurance renewal
OCR confidence is below the approval threshold before assigning the high-value glass shipment.
Adapter decision evidence for db-auth-session-adapter
AdapterDecision.v1 marks db-auth-session-adapter; archive 1/7 adapter decisions for DB/auth handoff.
Blocked
SLA exception for BFG-2026-0418
Control Tower wrote SLAException.v1; finance on Gdansk -> Lviv needs follow-up (โฌ7,528).
SLA exception for BFG-2026-4301
Control Tower wrote SLAException.v1; ETA on Kyiv -> Krakow needs follow-up (+95 min).
SLA exception for BFG-2026-4301
Control Tower wrote SLAException.v1; telemetry on Kyiv -> Krakow needs follow-up (Off route).
SLA exception for BFG-2026-4303
Control Tower wrote SLAException.v1; ETA on Lviv -> Chop needs follow-up (+95 min).
SLA exception for BFG-2026-4311
Control Tower wrote SLAException.v1; ETA on Warsaw -> Berlin needs follow-up (+95 min).
SLA exception for BFG-2026-4313
Control Tower wrote SLAException.v1; ETA on Prague -> Milan needs follow-up (+95 min).
Production decision owner review for db-auth-session-adapter
ProductionDecision.v1 keeps db-auth-session-adapter at BLOCKED_PENDING_DRY_RUN; Anna Kowalska must choose the real DB/auth provider before live wiring.
Infrastructure Decision captured
db-auth-session-adapter remains at BLOCKED_PENDING_DRY_RUN; Anna Kowalska must accept ProductionInfrastructureDecision.v1 before hosting/region/runtime/secrets-backup cutover.
Release handoff evidence for db-auth-session-adapter
ProductionReleaseHandoff.v1 records BLOCKED_PENDING_DRY_RUN; archive 3/5 release handoff gates for DB/auth handoff.
Rollback drill evidence for db-auth-session-adapter
ProductionRollbackDrill.v1 records BLOCKED_PENDING_DRY_RUN; archive 0/4 rollback checks for Anna Kowalska.
Done
No tasks in this lane.
Owner workload
Marek Zielinski
11 open tasks
Anna Kowalska
5 open tasks
Olena Shevchenko
3 open tasks
Automation handoff
These rules define how the local task board can later persist workflow state through the DB/auth adapter.
Priority triage
Critical and overdue tasks are pinned first for dispatcher review.
Owner handoff
Every status move keeps one accountable owner for the next adapter contract.
Demo closeout
Done tasks remain visible so QA can verify scenario completion.
Scenario follow-ups
Draft orders
0 drafts can become dispatch tasks.
Driver lifecycle
0 driver states are feeding task lanes.
Client requests
0 client evidence requests are waiting.
Finance signals
0 invoice signals are linked to task closeout.
Risk decisions
0 counterparty clearances create compliance follow-ups.
Assignment proofs
0 AssignmentDecision.v1 proofs feed dispatch follow-ups.
Dispatch actions
0 ETA / border actions feed dispatch tasks.
SLA exceptions
39 Control Tower exceptions create task follow-ups.
Pilot sign-off
0/5 reviewer checks are accepted for audit handoff.
Cutover rehearsal
0/6 DB/auth rehearsal checks are accepted for production handoff.
Adapter decision
1/7 adapter decision checks are ready for production handoff.
Adapter connection
0/4 connection checks are ready for DB/auth handoff.
Adapter dry-run
0/5 dry-run checks are ready for production handoff.
Release handoff
3/5 release handoff gates are ready for operational audit.
Rollback drill
0/4 rollback checks are ready for operational audit.
Production decision
BLOCKED_PENDING_DRY_RUN keeps the DB/auth production move blocked until an owner chooses infrastructure.
Infrastructure Decision
BLOCKED_PENDING_DRY_RUN infrastructure owner action remains blocked for DB/auth cutover.
DB/Auth Wiring
Production NO-GO guarded preflight checks are ready while live credentials stay blocked.
Session contract
ScenarioStore.v1 ยท mock-auth-header
Scenario tasks
11